Harbor Gantry Cranes (STS)
Topic
Container loading and unloading. Dock harbor cranes (STS, ship-to-shore cranes) are the container ports loading and unloading assets. Modern STS cranes have 40-90 m cantilever feathers on the ship to reach the furthest container rows of the dock (24-row manga container ships), lifting heights up to 50 m and cargo capacities of 65-80 tons (for containers of 40 feet at gross weights). The physical model integrates the structural resistance of the cantilever boom, the kinematics of the load/unload cycle and the lifting power. The lifting force includes the dynamic weight of the container during lifting acceleration. The bending moment at the base of the STS crane boom is the product of the lifting force by the length of the boom; This moment is the critical structural parameter of the crane and dimensions the cross section of the boom-drawer. The power of the lifting motor results from the force by the lifting speed, with the losses of the mechanism. The productivity of the crane STS (movements per hour) is the reverse of cycle time: high-efficiency terminals reach 30-40 movements per hour per crane. The cycle time includes the hoisting from the ship, the transfer of the cart over the boom to the spring side, the descent to the transport vehicle and the positioning time of the spreader (the attachment that grabs the container around the corners). The cable suspended spreader acts as a pendulum: the spreader oscillation frequency (typically 0.05-0.15 Hz) determines the waits needed to dampen it before positioning the container; Active anti-pendulation systems reduce this waiting time. Modern STS cranes recover the electric power of the container down (regenerative braking with efficiencies of 85-95%); In high activity cranes, recovered energy can exceed 30% of lifting energy. The STS crane wheel-rail contact voltage under the maximum load is the parameter that determines the design of the spring rail. The expected behavior is that the real productivity of the crane is lower than the theory due to anti-pendulation waits, breakdowns, shift changes and spread times. Group organization separates mechanisms and operating indicators without eliminating the original equations.
ID:3778