Tower cranes and mobile cranes
Topic
Tower cranes (fixed on site, with rotating boom) and mobile cranes (self-propelled on trucks or on tracks) are the elevation and positioning of heavy materials in construction works. The physical model integrates the mechanics of balancing of moments, the structural resistance of the pen and the mast, and the mechanics of the pendulum of the suspended load. The dump moment is the fundamental stability criterion of every crane: the moment of the load with respect to the axis of rotation (or overturning) must be compensated by the moment of the counterweight; The crane is designed so that the counterweight always generates a stabilizing moment greater than the load plus the safety margin. The table of loads of the crane is the practical representation of this balance: it establishes the maximum allowable load as a function of the range, which decreases with increasing the range because the arm of the force grows. The force of the wind on the structure of the crane is a load of determining design in works of height; The tower cranes have lightning rods and anemometers that automatically stop the operation when the wind exceeds 72 km/h (20 m/s) in operation and 130 km/h (36 m/s) out of service (free pen). The power of the lifting motor results from the load by the lifting speed; Contemporary variable speed motors allow to lift at slow speeds for maximum and fast loads for light loads. The suspended load acts as a simple pendulum: the oscillation frequency is inversely proportional to the square root of the free length of the cable; High-height loads with long cables have periods of 10-40 seconds, making precise positioning very difficult. The tension in the mast of the crane results from the moment of dump divided by the resistant module of the section. The deflection of the tip of the feather follows the Euler-Bernoulli formula for cantilever: it grows with the cube of the length of the feather and with the load, which limits the length of the feathers of heavily loaded cranes. The expected behavior is that the crane capacity decreases rapidly with range (double in range, sometimes less than half the load) because the momentum generated by the load grows linearly with the range.
ID:3711